Sunday, November 24, 2013

Home, Sweet Home

It feels so good to be "home". Home is a relative term seeing as how we live in a mobile, floating home. Of course for us, home is where our Hull is - haha, get it? Yah, corny I know... ;)

Anyway, we are back at our usual marina and it's wonderful. Neither of us expected to miss this place as much as we did but after a long and crazy 6 weeks we are so glad to be back.  It's much quieter here; less boat and people traffic - it's our sanctuary. 

We had a chilly and windy sail down the Bay this past weekend. Day got off to a rocky start - we had some engine issues but after a bit of basic troubleshooting and changing out a couple of filters we were on our way. We were able to sail nearly the entire 40 miles home, only having to turn on the iron genny once we turned up into our river.  Made decent time, about 7hrs and was able to pull into our slips 15min before sunset. A gale hit that evening so we were glad to make it home before it rolled in.  

Now that we are home the to-do list continues. I have to do a thorough inspection of our sail inventory and identify what repairs/improvements (or "Hassification") can be made. I also need to get a sail cover made ASAP - that will be a fun project. We need to build up our lazy jacks - we ran out of time before we left our "working marina". Those along with lots of other prep tasks...... Back to work!

       

Tango with her new mast, newly painted boom (hidden under the mails'l) and sails bent on...  We were finally ready to head "home". 




Saturday, November 16, 2013

Game Changing Weekend...

This past weekend we traveled all the way to the beautiful state of Washington so I could attend a sail repair seminar in Port Townsend. The seminar was hosted by world renowned sail maker Carol Hasse and her sail loft crew. It was an intensive, long two days but such an amazing weekend. Words really can not describe the high I feel right now. First, if you've never seen the quality of Hasse sails, you can see some of it HERE.


 
Sails build by Hasse and Company are built from premium Dacron and all of them (some 3500+ to a date) are built in their Port townsend loft. Each sail is carefully designed, cut, assembled and finished by a talented group of 12 women. Each sail is reinforced with leather and all corners, rings, chafe areas and hardware are HAND sewn! Not only is the quality of these sails superb and far superior (in my opinion) to other production sails but they are beautiful!! They are truly works of art. 
 
I attended the class with 10 other people. Almost all of them were from the west coast - Canada, Washington or Oregon. One other couple was from Illinois but I was definitely from the furthest away. Each person was shocked to learn I traveled so far especially when I lived so close to one of the nations sailing capitals. Well, there is something to be said for learning from the best. 
 
The seminar was Saturday and Sunday - a total of 14 hours of curriculum. We went over offshore sail inventory, sail inspection, sail construction, sail repair and reinforcement (patch a hole, install a chafe guard, fix a torn seam, apply a spreader patch and reinforce a corner ring with webbing) and hand sewing with a palm and needle to sew in a ring, seize a jib hank, attach a mails'l slide, mend a seam, add a leather chafe guard and make "easy reefs".  The wealth of knowledge these ladies possess is amazing! 

Reinforcing strainer, round stitch and cross stitch

Leather chafe strip with running stitch and flat stitch

Sewn on slide, hank, easy reef and hand sewn ring

All the sail repair work, with machine.  Fixed holes, tears, seams, added patches and chafe guards.
 
 
As I mentioned part of the cirruclum was sail inspection. We were given the option to bring along a sail or two of our own to be inspected so we packed up our storm stays'l and checked it through to Seattle. 
 
We were so lucky to have Carol Hasse teach is portion of the seminar. She went step by step through the process of inspection, using our sail as an example. We knew this one was in rough shape - she had been used and put away wet. Her tack, clew and head rings are "batteries" and all her hanks are press on or crimp on and attached to grommets - so basically there was a lot wrong with this sail. She has another year, maybe two, left in her but I envision her being a training platform.

Battery... this is what happens when rings are not sewn in.  Only way to fix this is to cut it off. Not good when you're hundreds or thousands of miles offshore.

Crimped on hanks, with grommets.  Massive corrosion and unable to be reused or repaired.  Have to remove entirely and replaced.  This would not happen if done properly with sewn on rings and jib hanks.


Armed with this new knowledge, I plan on doing a complete inspection of our existing inventory and making improvements where I can, or "Hassisify" them as they say ;)  I'm so excited to put my skills to use! 
 
I also did some shopping while I was there. I purchased some tools and supplies for my offshore repair ditty bag, a new and beefed up palm from the local wooden boat chandlery as well as The Sailmakers Apprentice book - aka the sailmakers bible as I like to call it. 


New palm and needle case from the Wooden Boat Chandlery
 
I was also able to pick up the necessary hardware in order to turn our furling stays'l to a hank on sail.  Yes, we are once again going the KISS (Keep it Simple Sailor) route. Most folks transition to roller furling, not the other way around. So now that I can successfully, and quite easily, hand sew rings and sew on jib hanks I plan to convert our sail. I'll also be Hassifiying it a bit with some additional leather in the corners and doing necessary repairs I find during inspection. I'll be sure to blog about that project once it gets started. 
 
So we knew before heading to Port Townsend that we were going to order a new mains'l from Hasse. After the seminar, J and I were able to meet with her and put down our deposit. Our new main should be done around September - yay! A long wait but well worth it. We're also toying with the idea of ordering a couple of other sails (trys'l and light air sail) but we're going to have to see how the budget looks after we get done with our current projects. Ideally we would leave with a full suite of Hasse sails but not sure if that will be possible. Perhaps I'll attempt to do a trys'l and storm stays'l... Both are pretty straight forward, small sails - who knows, could be fun or could be a disaster ;)
 
We were able to enjoy some of the local sights while we were there too  - it was such a lovely town, honestly it was hard to leave. Awesome people, great sights, amazing food (didn't have a single bad meal) and the craft brew was some of the best we have had!  
Mount Baker as seen from Point Hudson in Port Townsend

After being there for the long weekend and talking to the sail loft crew as well as some local sailors we're thinking we may alter our route a bit and after the South Pacific, head North and make our way through Alaska and down into WA to spend a season there. It's seriously beautiful there! Oh and did I mention the beer?? ;) 

Thursday, November 7, 2013

BOATs

J and I live in a world of acronyms.  Just when you think you know what they all mean, another gets added.  While boat life doesn't have nearly as many, there are a few - not counting those which we've made up over the last few years, e.g., ASSWOP :)

BOAT - if you have a boat you likely know what this stands for.  Break Out Another Thousand.  

We've been busy trying to get things done with Tango's new mast and boom refurb so that we can sail "home" in the next week or so.  However, as J put it last night "we have more money than we do time" - how often can that be said!  Not only are our jobs hectic right now, but J is in school full time and I am in school part time.  AND tomorrow (Friday) we head to Port Townsend, WA where I will be attending a sail repair seminar at Hasse & Company, Port Townsend Sails (http://www.porttownsendsails.com/about.htm) and J will be meeting with world renowned sail maker, Carol Hasse to discuss the construction of our new mainsail.  While we are both very excited for the trip, the timing is not ideal.  There is still a significant amount of work to do before we can sail home and we're quickly running out of time. 

That said, we've decided to "BOAT" or perhaps "BOATs".  So far we're slightly under budget on our tasks which played into our decision to let the yard do nearly the rest of the work.  There are some smaller, easy items which don't need to be done until right before we leave to sail back, which we'll do. Our main concern is that there are things that must be done before other work gets done and being out of pocket for 5 days really throws a wrench into things. So, J met with the yard this AM and gave them a list of things we'll need done.  By the time we get back, she'll be that much closer to being ready to head "home".  

Wednesday, November 6, 2013

Back to the Grind

We're getting back into "work" mode after a wonderful weekend away. We headed to NC to witness a beautiful and wonderful couple tie the knot. It was a fantastic weekend! Our wedding was a crazy blur so it was so nice to actually enjoy a wedding! We drank, we danced (we got do our waltz) and met lots of wonderful people! We wish C&A the best of luck and lots of love in their marriage! 

So now that we're back we've got lots of work to do before we head back out of town this coming weekend (does the crazy ever end??).  First up we have to prepare all the new halyards. I started this task last night. J and I have been going around and around about these - do we eye splice them or do we use hitches? Our previous halyards, as well as halyards on all of our previous boats were spliced. However, we feel there are some disadvantages to this. First, there have been accounts of increased chafe from the eye splice rubbing against the mast head sheave box. Second, if it does chafe and we redo them (if it's possible and hasn't elongated too much) we'll have to sacrifice a few feet of line to do so.  Third, we're unable to end-to-end the lines if they are spliced. And last, it takes a while to do eye splices (and we've each only done them once before). Based on our research, a buntline hitch is an option. This is a very strong knot and commonly used for halyards. Chapman's recommends it as well as Brion Toss - both reliable sources in our opinion. 



So we've made the decision to give the buntline hitch a try. Worst case we can always eye splice them later. First thing to do is to whip both ends of the new lines. We decided to go with a sailmakers whipping as opposed to the regular whipping as we feel it is a better whip. 

       
                                                  Handy palm, needle and waxed twine. 

                                      

                                            Finished product except for hot knifing the end. 

While I am working on the halyards J is working on making adjustments to the headstay. As with most boat projects lately things are not going according to plan. What should take an hour is now already at 2.5hrs and counting. The roller fuller has three stripped screws which are refusing to come out. J was able to get one out last night but the other two, no such luck.  On to plan D which is yet to be determined but may end up being to enlist the yard to take care of it. 

Thursday, October 31, 2013

Mast Update

Good news to report - the new mast is in!! It's been a long few weeks, filled with more moments of frustration than of joy; but it was a great feeling, yesterday, to come home and see the new mast stepped! Tango looks awesome with her new rig, or at least most of her new rig.  Icing on the cake is that all the rigging that J replaced two years ago fits!! We don't have to modify the rest of them (we know we have to do the headstay). Shortening the standing rigging beyond the capacity of the turnbuckles is NOT a fun, nor easy undertaking, so we're relieved everything fit as well as it did. 

So with one small (but major) victory, we move on to the next. The boom, which we treated for corrosion and repainted to match the new mast, is still curing. The mast and rigging will need a few days to settle in before we do a final tune and install the Spartite. In the meantime J and I have to build up the lazy jacks, splice the halyards (maybe, still debating that one), start reinstalling some hardware, and get our sails back on. We've decided to get our headsail (genoa) inspected and cleaned so we'll sail home with our new-to-us Yankee. We're anxious to try it out as it's been in the bag since we bought it from the M's last year. 

If all goes according to plan the boom will be installed early next week and then it will be time to work on the reefing system. We're trying to follow the example of the M's reefing, which runs through sheaves at the boom end to jammers internal to the boom, just aft of the gooseneck. J's phoned and emailed Forespar, the makers of the mast and boom, to find out if they still produce the jammers, but still no luck. If it doesn't work, we'll just run them through cheek blocks forward to external clutches on the boom. With any luck, we may be able to sail home late next week or, at the latest, the following week. Here's hoping! 

                                    


Here's an update of where we stand:

MAST:

Remove sails from old mast DONE
Bring to local sail loft to be inspected and cleaned
Wire anemometer and masthead light DONE
Install trysail track DONE
Fill radar holes and other holes not used DONE
Touch up paint on mast DONE
Treat/paint corrosion DONE
Remove/install winches DONE
Remove/install radar reflector DONE
Replace masthead sheave pin NOT RQRD
Replace masthead sheaves NOT RQRD
Swap best lights DONE
Measure/adjust (as RQRD) standing rigging DONE
Shorten headstay 
Lubricate sail track and whisker pole track DONE
Install whisker pole track fittings DONE
Install reef lines
Check cleats/clutches for halyards (ensure sufficient) DONE
Fill mast step holes DONE
Install mast step DONE
Silicone cotter pins on mast DONE
Swap over rigging DONE
Silicone mast head holes/wiring DONE
Safety wire shrounds to spreaders DONE
Reinstall spreader boots DONE
Install secondary VHF antenna and coaxial connector DONE
Install/run halyards (splice all new halyards)
Install new cleat
Polish all stainless hardware


BOOM:  

Replace outhaul with messenger line DONE
Remove outhaul track DONE
Remove all fittings DONE
Remove paint DONE
Treat corrosion DONE
Paint (Awlgrip Eggshell White to match the new mast) DONE
Install lazy jack tie down points
Install reef points
Build up lazy jacks
Install clew reef line clutches
Replace boom sheave pin NOT RQRD
Replace boom sheaves NOT RQRD
Lubricate outhaul track
Replace spacers with sheaves at end of boom NOT RQRD
Install jammers on boom
Polish all stainless 
Install outhaul track
Install all hardware 


Saturday, October 26, 2013

Mast Progress

After the boat show we sailed Tango over to Solomon's where we had the new (to us) mast shipped.  It was a long and not so fun sail.  What should have taken us 6hrs ended up taking 11hrs.  As usual, the weather was not what had been predicted.  NOTE: I am taking a meteorology class and hope that once I am done and we have our pactor modem all set up that I can do a better job of verifying/predicting weather.  Seems our weathermen lately are more weather guessers...  Anyway, I digress...  I was getting over a head cold and still had some head conjestion which unfortunatly messed with my equilibrium and caused me to be sick for the entire way (very green, didn't actually get sick).  Not fun!  Thankfully ASSWOP was ready to step in and take my place. She did awesome!!!  I have to admit she kept a course better than we do!  It is amazing technology!  We had winds over 20 knots and she loved it!  She'd fall off 5 or so degrees and then counter to get back on course.  Heavy gusts she'd get blown off maybe 10 degrees but would immediatley correct.  It was so cool to sit back and watch her work.  She will be awesome during those long offshore passages.  


Above: J making some minor adjustments to ASSWOP while she does all the "heavy lifting" :)  


We've been in Solomons for about two weeks now and as with any major project it never really feelsl ike your making progress becuase the list is just so long.  Add to that our work and personal lives are very busy right now with training, travel, events and we're BOTH taking classes.  I am taking two classes and J is taking three.  Life right now is wake up, go to work-work, come home change and report to the other work (mast), work until sunset, make a quick bite to eat, do 1.5-2hrs of school work, crash for the night...  Rinse, Repeat...  

This weekend we have a lot we want to accomplish on the mast as we hope to step the mast early this week.  We'll be out of town next weekend for a wedding and the following weekend we'll be in Port Townsend, WA for a sail repair seminar so we're running out of time.  I'll post some pictures of our progress but here's our list of things we needed to do on the mast and where we currently stand.  

MAST:

Remove sails from old mast (bring to local sail loft to be inspected and cleaned)
Wire anemometer and masthead light
Install trysail track
Fill radar holes and other holes not used
Touch up paint on mast
Treat/paint corrosion
Remove/install winches
Remove/install radar deflector
Replace masthead sheave pin
Replace masthead sheaves
Swap best lights
Measure/adjust standing rigging (shorten headstay)
Lubricate sail track and whisker pole track
Install whisker pole track fittings
Install reef lines
Check cleats/clutches for halyards (ensure sufficient)
Fill mast step holes
Install mast step
Silicone cotter pins
Swap over rigging
Silicone mast head holes/wiring
Safety wire shrounds to spreaders
Reinstall spreader boots
Install secondary VHF antenna and coaxial connector
Install/run halyards (splice all new halyards)
Install new cleat
Polish all stainless hardware


BOOM:  

Replace outhaul with messenger line
Remove outhaul track
Remove all fittings
Remove paint
Treat corrosion
Paint (Awlgrip Eggshell White to match the new mast)
Install lazy jack tie down points
Install reef points
Build up lazy jacks
Install clew reef line clutches
Replace boom sheave pin
Replace boom sheaves
Lubricate outhaul track
Replace spacers with sheaves at end of boom
Install jammers on boom
Polish all stainless hardware



Our girl, looking naked without her mast and boom.  






HOW could we forget?!?!?


So yesterday I was going through some pictures and came across our wedding photos. Such a wonderful day ( just wish it hadn't gone by so quickly!).  As I was going through them I realized that we failed to share, on our sailing blog, what we felt was one of the coolest parts of our wedding - the cake!!!! For those familiar with The Food Network you'll recognize the name "Charm City Cakes".  The show on Food network is Ace of Cakes. We went back and forth about this during our wedding planning but seeing as how we're relatively close to Baltimore, where their cake shop is, and we had some extra money in our budget from other cost savings we decided to go for it. We were not disappointed!  We wanted a 3D replica of our Tango, underway, complete with all the details, and with J and I at the helm. It was crazy how accurate it was!! 


They captured detail on our mainsail, our solar and radar, the dorades.... 


While J has a bit more gray here than he actually has (hehe) they did a really good job capturing everything even down to our attire. 




It was very hard to cut the cake as you can see by J's expression in this pic, and mine in the next photo. 



It was SO good!!! It was a blueberry and lemon curd cake - absolutely delicious! We had expected approx 75 people at the wedding but asked for a cake to feed 100 (hey, we like cake and it was so good during our tasting, we knew we'd want leftovers). Well we had 67 people show up and there were no leftovers!!! Guess it wasn't only us that thought it was so good ;) 










Wednesday, October 16, 2013

Sailboat Show - The Booty

So an update from our visit to the Annapolis boat show...

It was a LONG couple of days at the boat show but as usual, we really enjoyed attending. 

This year there seemed to be less vendors which was upsetting, especially since some of them we had planned on visiting. We heard from the M's, who attended the Newport Show, that the same has happened there as well.  Hopefully this year was just a fluke...

We made some progress on our list, did lots of research and price comparison, and even walked away with a few items not on the list (shocking, that never happens). Here's where we stand:
  • New Screens for the Port Lights
  • FX-37 Fortress Anchor - DONE
  • Offshore Foul Weather Gear - DONE (and they rock! So much better than our current gear. They are breathable and super comfy)
  • Boom Vang (we have one but not sure if we are going to replace it or repair it)
  • Replacement Reading Light for the Saloon
  • Breeze Booster (we have one for the port light and LOVE it! We want another)
  • Solar Panels (we want two more to add to our existing two)
  • Blue Sky Solar Regulator
  • Wall Thermometer
  • P4 Dragon Pactor Modem
  • Sea Anchor
  • Drogue
  • Wind Generator
  • New Batteries
  • Hatch Refurbishment
  • Filter Boss Commander
  • Swim Ladder
  • Piston Arm for Main Hatch
  • Handheld VHF - DONE
  • Chain Stopper
J in his new offshore gear (please ignore the mess - this was taken just as we got home and were unpacking from our weekend at the show.)



The items which we left with that were not on our original list:
  • ATN Mast climber (just the ascenders, we already have a bosuns chair)
  • Chain markers for our anchor rode (we tried using rescue tape to mark the chain in 25ft increments.  While it withstands being in the water, when it is deployed/brought in the windlass tears it apart. Time to look for alternatives, maybe what we got at the show will work).
  • Snatch Block for Sea Anchor (we LOVE Garhauer.  If you ever need any sort of block, tackle or stainless work done, definitely check them out.  
  • Lifeproof waterproof iPad cover 
  • SSCA membership

We had a wonderful time meeting with other Mason owners. We met 4 other couples and had an opportunity to share storeies about our cruising adventures, future plans and of course boat projects.  Turns out two of the couples are in the same area as we are!   We look forward to seeing them out on the water in the coming years.  

Volunteering was a blast - the folks at Good Old Boat are awesome, nuff said!  We had the last shift of the day so the boat show traffic had started to die down a bit (the rain didn't help either) but that didn't stop us from bringing in some renewals as well as new subscribers.  It really is a great magazine.  We're planning to volunteer again next year as well.  

Thursday, October 10, 2013

One of our favorite weekends of the year!

Birthday??  Christmas??  Beer Festival?? (That's a close one!)

No, it's the Annapolis Sailboat Show! 

Unfortunately this year the weather is not cooperating with us.  Looks like it will be in the mid-to-lower 60's (loving the temps!) but will be raining for the two days we'll be there. 

This year we are heading up with a longer list than in previous years.  Some must buys, some hope to buys and some things we need to research. 

Here goes:
  • New Screens for the Port Lights
  • FX-37 Fortress Anchor
  • Offshore Foul Weather Gear
  • Boom Vang (we have one but not sure if we are going to replace it or repair it)
  • Replacement Reading Light for the Saloon
  • Breeze Booster (we have one for the port light and LOVE it! We want another)
  • Solar Panels (we want two more to add to our existing two)
  • Blue Sky Solar Regulator
  • Wall Thermometer
  • P4 Dragon Pactor Modem
  • Sea Anchor
  • Drogue
  • Wind Generator
  • New Batteries
  • Hatch Refurbishment
  • Filter Boss Commander
  • Swim Ladder
  • Piston Arm for Main Hatch
  • Handheld VHF
  • Chain Stopper

So yah, it's a SERIOUS list!!

To make this year even better we've got two exciting events.  First we are going to be volunteering with Good Old Boat on Saturday.  This magazine is awesome and more than once we've been able to use their articles to help us with our own projects.  We always look forward to getting our copy in the mailbox!  Second, we'll be meeting up with 4 other couples who are also Mason owners.  We've met one couple (the M's) but are very excited to meet others!  Can't wait to share stories, lessons learned, cruising plans and future adventures with them!

While the weather has been less than ideal the last couple of days, the sunsets at the dock have been spectacular! 
Wednesday Evening

Tuesday Evening

Brain Break... Sort Of

Things have been busy aboard S/V Last Tango since our last post.  We're continuing to make progress on our refit/offshore/long term cruising prep (more detailed posts on those projects to follow) and I think we've got a good 6 or 7 lists in work: things to buy at the boat show, projects to complete now, projects in work, must do before we leave the dock, must do before we cross an ocean, things to do when we have time, aka the nice to haves and so on...

But between life (read: schoolwork and work-work) and some fun landlubber trips to play tourist and visit family we've been trying to get away from the dock when we can.  It can't be all work and no play!  

A few weeks ago we threw off the lines and headed to one our favorite spots up the St. Mary's River and anchored out for a night.  We got there early enough on Friday that we got some down time but sadly had to head back the next day.    Our dock mates and very good friends aboard S/V Doggie Paddle joined us.  It was a wonderful weekend, but as usual, all to short!  This is a pic, captured by A aboard Doggie Paddle - Thanks A!

 

Then the following weekend, with the weather working in our favor, we headed back to St. Mary's but this time we'd have a couple of nights on the hook - yay!  A few hours after dropping the hook, our friends on Doggie Paddle (unexpectedly) pulled into the creek as well - a great surprise!  That night we met for sundowners and decided to meet up again in the morning for a potluck breakfast.   This is one of the things we love about boat life - impromptu gatherings.

S/V Doggie Paddle in the background and the S's on their way over for breakfast!
J took the dink over to the college to pick up our friend P for breakfast. Love that we can pick up our land friends while we're on the hook!
 

The weather couldn't have been better, cool temps and a light breeze. We had two days in the river and while it was a much needed brain break from "normal life" it was a rather productive break.  J did some work on our electrical system and battery charger (more from him on that, I'm sure), he troubleshot and fixed our solar (seemed as though they were not working but turns out it was just a bad connection).  We've applied a Band-Aid for now until we can find better electrical connectors for them.   WM only carries one brand, the same ones that we currently (which we don't like, they broke after a few short years) so more researching on those will be needed before we can fully be done with that project.  We are swapping out our mast (post will be done soon on that topic) and were able to find a great deal on a used winch (we needed one more) on eBay so I spent a couple of hours servicing the "new to us" winch.  Also I knocked out some polishing and rust/corrosion treatment and was able to finish a couple of school projects.

I don't know if other boaters feel this way but boat work for us always feels cathartic, especially when being done on the hook.  You're outside, away from it all - just you, the water slapping on the hull and the project at hand...